What the technician records
Brick opening width and height at three points each, floor level, reveal depth, wall construction, swing direction, and anything mounted nearby such as an intercom, a switchboard or a grille track.
Three visits from us and one signature from you. This page walks through exactly what happens between the first phone call and the moment you close the new door for the first time.

Free anywhere in Selangor, Kuala Lumpur, Putrajaya and Negeri Sembilan, with no obligation to order afterwards. It takes about twenty five minutes.
Brick opening width and height at three points each, floor level, reveal depth, wall construction, swing direction, and anything mounted nearby such as an intercom, a switchboard or a grille track.
An idea of the series you like, any finish samples you took from the showroom, and about five minutes to talk through how the entrance is used day to day. Children, pets and wheelchair access all change the specification.
A written quotation within one working day, itemised into leaf, frame, hardware, lock and installation, so you can see exactly where the money goes and change any single line.
If the wall cannot carry the door you asked for, if the porch is too exposed for timber, or if repairing your existing door is a better use of your money than replacing it.
Our Kapar workshop cuts, welds, assembles and coats. Aluminium and steel work moves from the saw to the welding bay, then to pretreatment and the powder line. Timber is machined from stock that has already been kiln dried and rested.
Coating is the stage that sets the delivery date. A colour we hold runs the same week. A special order colour waits for a batch, which is why a request for a non-stock RAL shade adds seven to ten days to the schedule.
Every leaf is hung on a test frame before it leaves. If it does not swing sweetly in the workshop it will not swing sweetly at your house.

Most single door installations take three to four hours. Double leaves and steel frames in masonry can run to a full day.
Floor coverings down, dust sheets on anything near the opening. Drilling into brick makes a mess and it is not your job to clean it up.
Removed, carried out and loaded. Disposal is included, and we take the scrap value into account on the quotation rather than pocketing it quietly.
Levelled, plumbed and anchored into the masonry, then packed and sealed. This is the stage that decides whether the door still closes properly in ten years.
Hinges set, closing gap checked all round, strike aligned, weather strip dressed and the lock cycled at least twenty times before we call it finished.
If a digital lock is part of the order, we register the first users with you, show you how to add and remove one, and leave the emergency key and the manual in your hand.
Warranty sheet, touch-up stick, keys and a walk round the finished opening together. Then the vacuum comes out and the dust goes with us.
New buildings move. Renovated openings move more. If anything shifts in the first months, call us and we will come and adjust hinges, strikes and closers at no charge inside the warranty period.
Outside warranty we still service every door we have supplied since 1994. Old records are on paper in the Klang office, and we have dug plenty of them out over the years to find a matching profile.

There is no fee and no obligation. Worst case you get accurate numbers and a written quotation to compare against anyone else.